Latest news

Heidelberg staff residence - First look at the construction site

Our project 'Wieblinger Weg staff residence' is taking shape: Thanks to prefabrication, both in terms of speed and ecology.

Prefabricated cavity wall elements are used for this, which are filled with 'RC concrete' (recycled concrete). The exterior walls (façade) and floor slabs are prefabricated from solid wood panels and will soon arrive on site. With this concept, we can minimise the use of concrete, shorten the construction time and make a significant contribution in terms of ecology and sustainability.

en_GBEnglish